Infrastructure Operations
SECTOR GRID AEMMEReal-time asset health, anomalies and maintenance intelligence.
Fleet Integrity: 99.4% Nominal
Total Assets
5 Assets
5 High-Tension Pylons
Active Warnings
1 Warning
Tower 04 (Vibration breach)
Critical Outages
0 Critical
Zero grid outages
AI Investigations
1 Active
INV-2026-0047 Orchestrating
Monitored Asset Fleet
5 Transmission Pylons across Sector North and South Valley
| Asset ID & Name | Status | Health Index | Vibration (RMS) | Temperature | Last Maintenance | Trend | Action |
|---|---|---|---|---|---|---|---|
Tower 01 Primary Insulator Stacks | Operational | 94 | 2.1 mm/s | 42°C | 24d ago2026-08-04 | Stable | Inspect |
Tower 02 Tension Assembly T02 | Operational | 91 | 2.4 mm/s | 44°C | 41d ago2026-07-18 | Stable | Inspect |
Tower 03 Damper Array D09 | Operational | 88 | 3.1 mm/s | 46°C | 62d ago2026-06-27 | Stable | Inspect |
Tower 04 Bearing Assembly B17 | Warning | 68 | 7.8 mm/s | 68°C | 94d ago2026-05-26 | +17.8% | Investigate |
Tower 05 Busbar Coupling C01 | Operational | 96 | 1.8 mm/s | 39°C | 12d ago2026-08-16 | Stable | Inspect |
Active Intelligence•INCIDENT INV-2026-0047Awaiting Engineer Approval
Tower 04 / Bearing Assembly B17
Abnormal vibration pattern detected (+17.8% over 36h). Thermal correlation confirmed.
Detected: 10:21:43
Severity: High
Current Agent: Maintenance Agent
Progress: 7 / 7 Steps
Tower 04 — Vibration Telemetry Trend (36h Horizon)
CRITICAL BEARING B17Root-mean-square velocity recorded via tri-axial accelerometer VIB-T04-B17
Current Signal
7.80 mm/s
Deviation vs Baseline
+17.8%
Measured Velocity (mm/s)
Historical Baseline (6.62 mm/s)
Baseline deviation detected starting at T-24h (p < 0.001)